Where to start with a period home renovation

A practical first brief for a Richmond house, from recording the original features to setting a budget for the work you cannot see.

Original fireplace and cornice in a Georgian house at the start of renovation
Illustrative image

Walk the house at different times of day

Note where the morning and afternoon light reaches, which rooms are cold, where bags land and where two people cannot pass comfortably. Put these observations next to the existing plan. This gives your designer specific problems to solve before anyone suggests removing walls.

In a period house, list the parts you would be sorry to lose. A staircase, timber floor or original fireplace can anchor a new layout. Take photographs and note which features need protection while the rest of the work takes place.

Investigate before committing to finishes

A condition survey should inform the scope. Look into recurring damp, signs of movement and older electrical or plumbing installations with the appropriate specialists. With a liveable home, discuss when targeted investigation can happen and what can wait until work opens up the building.

Keep a record of what the price includes, what is still provisional and who will make each decision. That helps you compare quotes for the same scope.

Make the budget reflect the order of work

Group the brief into essential repairs, changes that make daily life easier and finishes you could choose later. Leave a contingency for discoveries, agree when drawings and samples are needed, and ask the team to explain the proposed sequence before you confirm dates.